Mini-Holland (Go Cycle) – October 2018 update

Progress continues on a large number of different Mini-Holland schemes in Kingston town centre. The main progress since our last update in June has been:

  • The Kingston High Street scheme has finished;
  • Works continue on Wheatfield Way;
  • The Kingston Station plaza is almost complete;
  • Work has commenced on the New Malden to Raynes Park scheme; and
  • Work has started on the main Kingston Vale route.

Kingston High Street – construction has now (subject to a couple of snagging points) been completed. This high quality scheme extends the very successful Portsmouth Road segregated 2-way cycle track onto Kingston High Street until just after its junction with Kingston Hall Road. As a next step, we would like motor traffic to be restricted on the North part of Kingston High Street (between Kingston Hall Road and the Market Place) to finish this link into Kingston town centre. We have also asked the Council to review loading bays and the times when loading is allowed before they are placed next to/on cycle tracks; we understand that this is now being looked at for future schemes and is also being monitored on completed schemes.

Wheatfield Way – construction of the 3m wide 2-way cycle track between College Roundabout and the junction with Brook Street has been completed (signage/paint markings to be added). Work has recently been taking place at the Clarence Street/Old London Road junction (next to Wilko’s); Fairfield North junction (next to Fairfield Bus Station) and Brook Street junction. As per our last newsletter, we have been disappointed in some of the Wheatfield Way works and have been discussing with the Council the improvements that should be made. In good news, the Council has agreed to amend the shared island at the Clarence Street junction to allow easier and safer access by people on bikes. The Council is also looking at improvements to the Brook Street junction too. Unfortunately, despite these improvements, the scheme as a whole will still have a number of areas of shared use areas for pedestrians and people on bikes at junctions. We understand that this is due to TfL not allowing segregated space at junctions due to impacts shown in traffic modelling. We also await confirmation of when the consulted 20mph limit will be implemented on Wheatfield Way.

img_20180721_144338-e1539539025656.jpg

Wheatfield Way segregated 2-way cycle track between Brook Street and College Roundabout

Kingston Station – construction of the plaza directly outside of the station has almost finished. The Station works have also included re-laying the 2-way cycle track underneath the railway bridge on Richmond Road to provide a much smoother surface than before. Works on this scheme are now focussed on Wood Street to get ready for the replacement pedestrian and cyclist bridge to be installed over Kingsgate Road in Spring 2019. We have also heard that the ‘Beacon’ planned for the station plaza has been cancelled. We welcome this decision as the savings from this will be reinvested in other Mini-Holland schemes which offer greater benefits for people on bikes (and pedestrians) than the Beacon would have done.

New Malden to Raynes Park – construction of this new route has now commenced. People on bikes and pedestrians will have their own separate paths from New Malden to Raynes Park Recreation Ground where the route will then connect into current cycle routes (which we hope will be improved by Merton Council in due course!). It is great to see construction start on this scheme and we are already looking forward to it being finished.

IMG_20180825_150012

Current state of New Malden to Raynes Park route

Kingston Vale – construction on the main part of this route has also finally started! Kingston Vale is the longest individual scheme of all the Mini-Holland schemes and reaches from Kingston town centre all the way through to the Robin Hood junction on the A3. On its way it will connect numerous shops, schools, Kingston Hospital and Kingston University’s Kingston Hill campus. Work has started between Derwent Avenue and Warren Road and will include the installation of new zebra crossings (replacing informal ‘refuges’), new kerbs where these are needed and, for most of this section, the installation of Orcas (or an equivalent) to separate people on bikes from motor traffic. Orcas have been successfully used in many cycle schemes already in London and provide semi-segregation for cyclists from motor traffic. Although we would have preferred full segregation along the whole length of the route, the cost of this would have meant that other Mini-Holland schemes would not have been possible. To supplement the Orca installation, the Council will also be looking at putting in ‘wands’ and segregation islands where these are needed on the route.

What’s next

As above, there are a lot of schemes now in progress. Works will continue this year and into 2019 on the Kingston Station scheme; Wheatfield Way; New Malden to Raynes Park and Kingston Vale. 2019 should also see the start of works on Penrhyn Road, linking the Wheatfield Way scheme with Surbiton (passing the main Kingston University campus on its way).

Kingston Cycling Campaign will continue to ask the Council for any improvements needed to schemes. If you have any comments on the Mini-Holland schemes proposed or currently in construction, please let us know.

 

Advertisements

Mini-Holland (Go Cycle) – June 2018 update

2018 is turning into a busy year for Kingston’s Mini-Holland (Go Cycle) schemes. Since our last update in April:

  • Main works have finished on the Surbiton links and the Kingston Vale ‘quietway’;
  • construction has continued at Kingston Station and Wheatfield Way; and
  • works have started at Kingston High Street.

Kingston High Street – construction has only recently started (in May) but already a huge amount of progress has been made as the council plan to finish main carriageway works in time for Ride London on 29 July 2018. As we’ve said before, this scheme is a natural extension of the very successful Portsmouth Road scheme and will allow cyclists to be segregated along Kingston High Street until just North of the roundabout with Kingston Hall Road. In the future, we would like the council to consider reducing motor traffic on the North part of Kingston High Street – the recent High Street works showed what a pleasant route this could be for pedestrians and those on bikes if motor traffic was restricted here.

IMG_20180602_165255

Kingston High Street works

Kingston Station – construction has made swifter progress recently and the extended paving outside the station is almost complete. Works have now moved across to Richmond Road (outside Tesco Express) to add new carriageway paving. Although we are pleased to see that the motor traffic lanes have been narrowed and the station plaza is now much larger, we are still disappointed that so much of the mini-Holland budget (as well as so much of the Council’s efforts) have been spent on public realm enhancements whilst not making substantial improvements to walking or cycling directly outside the station.

As the Kingston Station scheme continues, we look forward to the Richmond Road works being completed as this will include relaying the 2-way cycleway with a new surface under the railway bridge. We also look forward to the (hopefully imminent) introduction of the 20 mph limit on the one-way system outside the station which was part of the original consultation and could help to calm motor traffic through the area.

In other changes in the area, the shared pedestrian/cycle bridge over the one-way system at the junction of Wood Street and Kingsgate Road was successfully removed in April ready for a much wider bridge to be installed. We also understand that the design and planning of the 250 space cycle hub at the station continues to progress.

Wheatfield Way – construction has continued from College Roundabout and is almost complete up to the junction with Brook Street. Work now continues from Brook Street towards the Orchard Road junction.

WW photo - Copy

New 3m wide 2-way cycle track being installed on Wheatfield Way

What’s next?

As above, Kingston High Street works are being completed quickly and should be finished over the next few months. Wheatfield Way works will continue over the course of the year, as will the Kingston Station works. The next two schemes we are looking forward to starting are the Kingston Vale (main route) and the New Malden to Raynes Park (mainly) off-road route. We understand that the Kingston Vale design is being finalised and construction could start later this year. On New Malden to Raynes Park, planning permission has now been granted by both Kingston and Merton councils so subject to Thames Water approvals, meeting the planning conditions and any final Transport for London approvals required, construction could also start later this year.

 

Mini-Holland (Go Cycle) – April 2018 update

Since our last update in February, work has continued on four different Mini-Holland (Go Cycle) schemes in Kingston and Surbiton:

Wheatfield Way – following works on the pavements (moving streetlights away from the kerb), the central reservation is now starting to be dug up ready for further changes to the road. When finished, there should be a 3m wide two-way cycle track alongside the majority of Wheatfield Way from College Roundabout to the Rotunda. This should eventually link through to Surbiton and Tolworth.

Kingston Station – work on the paving outside the station continues but at a slower pace now work has finished in the carriageway. However, the main activity to be visible in April will be the removal of the shared pedestrian/cycle bridge over the one-way system at the junction of Wood Street and Kingsgate Road. This bridge was due to close today (3 April) and will be removed during the weekend of 14/15 April. Work will then be undertaken on the surrounding area, ready for a much wider bridge to be installed and opened. We understand that the new bridge will take at least six months to be ready so cyclists will be diverted to use Wood Street; Dolphin Street and Fife Road during this time (see this map for further details).

Maker:S,Date:2017-9-22,Ver:6,Lens:Kan03,Act:Lar02,E-Y

Narrow shared bridge to be replaced

Kingston Vale ‘quietway’ – work on amending the modal filters (preventing motor traffic from going in both directions but allowing cyclists through) has continued. We await construction on the main Kingston Vale route which will hopefully follow later this year.

Surbiton links  – work on these is almost complete. This includes the segregated path on St Marks Hill (heading up the hill); the segregated two-way path on Claremont Road (from Maple Road to The Crescent) and minor works on Avenue Elmers and The Crescent. One of the final major works was the Maple Road/Claremont Road/Surbiton Crescent junction. The new traffic signals are now switched on at this junction allowing cyclists to use each of the crossings on all arms of the junction. Shared space surrounds each corner of the junction allowing cyclists to access the other Surbiton ‘links’ (Avenue Elmers; Surbiton Crescent; and Claremont Road track). Resurfacing of the junction and adding line markings and signage should be completed during April.

IMG_20180324_131345-COLLAGE

Upgraded Maple Road/Claremont Road/Surbiton Crescent junction

Finally, more and more cycle specific signage is being installed as route sections are completed. To ensure the routes will be identifiable; clearly marked; and easily understood, the Council have worked with Transport for London (TfL) to apply the ‘Quietway’ signage to the routes so far. Quietway 19 is being used for Portsmouth Road and Quietway 20 has been used so far for the Surbiton ‘links’. We expect that, when everything is finished, Quietway 20 will extend from Kingston all the way to Tolworth. We hope TfL will be adding these to their Quietways pages soon to help cyclists find these routes.

IMG_20171203_143513-COLLAGE

Quietway signage

We continue to work with Kingston Council to identify any issues with proposed designs as well as to feedback back any comments on routes constructed. If you have any comments that you would like to share with us, then please add them at the bottom of this page or contact us directly.

Mini-Holland (Go Cycle) – how’s it going?

If you have been travelling around the borough recently, particularly around Kingston town centre, it will have been difficult for you to miss some of the recent progress on the mini-Holland (Go Cycle) schemes. We are pleased to see that 4 different schemes are currently in construction which means Kingston is catching up on some of the backlog of schemes that have been approved by the Council.

2017: a recap – what mini-Holland progress was made?

  • The new segregated cycle track heading up St Marks Hill in Surbiton opened.
  • A number of Mini-Holland schemes were approved by Kingston Council’s Resident’s Committee (including Kingston Vale; Penrhyn Road; New Malden to Raynes Park; and Kingston High Street)
  • Despite the Portsmouth Road scheme not yet fully linking all the way into Kingston town centre, Will Norman (the Mayor of London’s cycling and walking commissioner) recently announced that cycling has already doubled during the week (up 76-104%) and is up 59% on weekdays 7am-7pm.
  • Work commenced around Kingston Station.
  • Wheatfield Way – The first part of this scheme was partially constructed between the Rotunda and Wilko’s. The 2-way cycle path built is 3 metres wide and, although not quite as wide as some of the new Cycle Superhighways in central London, it is the same width as much of the successful Portsmouth Road scheme.

2018: what’s happened so far and what might happen in the rest of 2018?

  • Kingston Station – the construction around the station has been continuing and should be mostly complete by the end of 2018. Work will also hopefully start on the new cycle hub at the station.
  • Wheatfield Way – Work has already started on the rest of the route and we are hopeful this will be complete during 2018 which will finish the link between Kingston Station and College Roundabout. This will be open up a new North-South cycle route through Kingston’s centre with the route fully segregated from the road.

    MVIMG_20180208_132439

    New segregated cycle track on Claremont Road, Surbiton

  • Surbiton links – work has been undertaken early this year to finish some of the Surbiton Mini-Holland links including on Claremont Road (see photo) and Surbiton Crescent. There is now work at the junction with Maple Road and Claremont Road to join the links together (including onto Avenue Elmers).
  • New Malden to Raynes Park – this received approval from the Residents Committee in November 2017 so, subject to Transport for London funding, we hope that work will start on this completely new segregated cycle and walking link in 2018. Kingston Cycle Campaign have campaigned strongly for this route – further information about our campaign can be found here: Raynes Park to New Malden petition.
  • Kingston Vale – this route will link the centre of Kingston through to the Robin Hood Junction on the A3, intersecting with some key destinations along the route including a number of shops; Kingston Hospital; Richmond Park and Kingston University’s Kingston Hill campus. This scheme was approved by the Residents Committee in June 2017 and work has started this year on Gordon Road and Canbury Park Road. We hope to see some spades in the ground on the main part of the route later in 2018 (again, this is likely to be subject to TfL funding!).

What will Kingston Cycling Campaign be doing in 2018 for Mini-Holland?

  • We hope to be able to continue to work with the council on the design of schemes to ensure that as many issues as possible are spotted and fixed before construction starts!
  • We will be keeping an eye on the implementation of schemes and make sure that they improve safety for all cyclists and encourage people to get on their bike.
  • We will continue to respond to any further consultations on Mini-Holland and will encourage the Council to push Transport for London to release the necessary money to implement the schemes already approved as soon as possible.

You can find more details about all the schemes from Kingston Council’s website by following the links above or going to: https://www.kingston.gov.uk/go

Mini Holland proposals, (Go Cycle)

These consultations have now closed

The Kingston Cycle Campaign broadly welcomes the latest Mini Holland proposals, (Go Cycle) the Council seem to have limited the amount of ‘shared Space’, which we welcome, but all 3 Schemes would benefit  from more Cycle parking, especially near Shops. The Consultations can be found at www.kingston.gov.uk/consultations , or follow the link in each of the Paragraphs below.The closing date is 17 November.

Kingston to Kingston Vale There is still possible conflict with parked cars in Old London Road. It would help if the car parking was reduced in this area. The ‘two-way cycle track’, from the Queen Elizabeth Road junction to Cambridge Road, continuing to the roundabout junction with Park Road and Kingston Hill,  looks promising. The route continues on Kingston Hill with a segregated cycle lane on both sides. Apart from some small sections of shared space, there does need to be provision for a segregated crossing for cyclists who wish to turn right from Galsworthy Road onto Kingston Hill, or vice-versa. The link for this individual scheme is http://consult.kingston.gov.uk/portal/planning/go/go_cycle_october_2016/gckv

Kingston to New Malden The crossing from the two-way cycle track on London Road, to continue along Cambridge Road, looks promising. The junction with Chatham Road and Hawks Road will need careful design to minimise conflict with pedestrians. And to keep the existing link between Chatham Road and Hawks Road a viable option, there needs to be full segregation under the rail bridge near South Lane West. If Cyclists do have to use ‘shared space’ where delivery vehicles are parked, there needs to be clear signage. The link for this scheme is http://consult.kingston.gov.uk/portal/planning/go/go_cycle_october_2016/gcnm.

Kingston to Tolworth The two-way cycle track along Penrhyn Road as far as Grove Crescent looks promising, continuing with seperate cycle lanes either side of the road. St Marks Hill will need a crossing for cyclists who wish to access Hollyfield School, also those who wish to access King Charles Road and other routes from Lamberts Road. The design of the ‘central cycle lane’ along Ewell Road needs to ensure that there are no conflicting traffic movements where car traffic wants to turn right across the cycle path, it might be better to continue the ‘two-way cycle track’ at the side of the carriageway, then join up with the ‘Greenway’ at the junction with the Broadway. The link for this scheme is http://consult.kingston.gov.uk/portal/planning/go/go_cycle_october_2016/gct

All three schemes should be supported. We urge everyone to go to the www.kingston.gov.uk/consultations page and fill out the seperate consultation for each of the three schemes. You can find more of our thoughts at http://kingston.cyclescape.org/threads , the Consultations close on 17 November.

Consultations open until 18 July 2016

Kingston Council have four Mini-Holland consultations open until 18 July 2016  – see

http://consult.kingston.gov.uk/portal/planning/go/consultations_summer_2016/

These schemes need real improvement  so we’re asking you to respond to all four, calling for the routes to be completed and for cycles to be separated from both motors and pedestrians.  We have suggested responses at:

kingstoncyclecampaign.wordpress.com/2016/06/30/suggested-response-to-mini-holland-consultations-july-2016/

And please feel free to join in our discussion on Cyclescape:

http://kingston.cyclescape.org/

Suggested response to Mini Holland Consultations July 2016

Kingston Council have four consultations open until 18 July 2016 on their Go Cycle or Go Programme (previously Mini Holland).

http://consult.kingston.gov.uk/portal/planning/go/consultations_summer_2016/

The schemes need real improvement. So please complete all four and call for the routes to be completed and cycles to be separated from both motors and pedestrians.

These are our brief suggested responses which please feel free to use as the basis for your own responses. Do complete the “comments” sections – the questions asked are closed and will not allow you to seek what cyclists really want.
Continue reading

Mini Holland Consultations

Kingston Council have four Consultations open until 18 July 2016 on proposed Go Cycle or Go Programme (their branding for Mini Holland) cycle routes.

  • Kingston Station
  • Wheatfield Way
  • Kingston to Surbiton
  • Fountain Roundabout, New Malden (below)

Fountain Roundabout proposed layout

You can access the consultations here;

http://consult.kingston.gov.uk/portal/planning/go/consultations_summer_2016/

Please complete all four and call for fully protected space for cycling separate from both motor traffic and pedestrians. Our initial view is that the proposals are disappointing. Mini Holland and the Mayor’s Cycling Vision for London were intended to be transformational. Kingston’s proposals have a lot of space shared by pedestrians and cyclists, creating conflict for both. Junctions which are challenging for inexperienced cyclists are sometimes ignored.

There are some promising features such as segregated cycle tracks, but the schemes need real improvement if they are to work. We managed to get the Council to improve Portsmouth Road so please let’s get these schemes improved by completing the consultation.

Our detailed discussion of all 4 schemes is publicly available on Cyclescape.org;

http://kingston.cyclescape.org/

Please feel free to contribute.

 

FAQs for the Portsmouth Road scheme

image.jpeg

We’ve seen comments on social media and in the local papers about the mini-Holland two-way cycle track that’s under construction on the Portsmouth Road, and we’d like to help clarify any issues and correct any misinformation that is in circulation. Therefore we have put together a list of responses to frequently raised issues. Kingston Council is responsible for the design and implementation of the scheme. We hope that you will find these answers to “Frequently Asked Questions” helpful.
Continue reading

Ordinary People on Bikes use Mini Holland

Its an expensive play area for the mamils of Kingston they said.
No, everyday people with bikes will use it, we said.

Its not finished but people are using the Portsmouth Rd cycle lane. Who would have thought!

 

Turns out the the most populous mamil is homo sapiens.

Portsmouth Rd is being built in 3 phases. Phase 1 (Palace Rd to north of Brighton Rd) has been constructed but we understand can not be officially opened until certain signs which are on order have been installed. Phase 2 High St to Palace Rd) is under construction now (May 2016) and will be completed this Summer. The last Phase 3 (south past Brighton Rd) should, we’re told, be built by the end of 2016.

We look forward to all types of rider enjoying the completed, almost 1 mile long, fully protected cycleway.

Congratulations to the Royal Borough of Kingston for being nominated for Portsmouth Rd in the best Borough Infrastructure Scheme category at the London Cycling Awards;

http://lcc.org.uk/articles/2016awards

Sadly runners up this year to Camden’s worthy winner in Tavistock Place but we’re in august company with joint second Waltham Forest’s Lea Bridge Rd. Let’s make Portsmouth Road the benchmark, improve and win next year RBK !